Mall Of Sousse, the numbers of a challenge:
- 14 600 square meters of prefabricated floors;
- Totally prefabricated administration block with 16 meters long-range slabs on 5 floors;
- Pillars of the administration block 23 meters high, each produced in one piece;
- 107 pillars;
- 715 prefabricated pieces;
- 3325 m3 production of prefabricated elements;
- Production in 110 workdays;
- Production start date: October 19th, 2017;
- Assembly on site – starting date : December 18th, 2017;
- Assembly on site – ending date : March 3rd, 2018;
- Assembly time : 57 workdays;
- Assembly teams : 2;
- Cranes : 2 (120 tons and 200 tons)
- Average number of pieces assembled per workday : 13