Big constructions

Share

Corolla di Calcagno s.r.l.

Back
  • MQ SURFACE 25 450
  • MC CONCRETE STRUCTURAL 4222

Structural features:

IPERCOOP

  • 1 elevation above ground;
  • Section pillars 60×60 cm;
  • Mesh pillars 28,00×12,50 m;
  • Coverage consists Fiondal tiled with shells in concrete;
  • Overall height of deck varies from 5.00 but 5.90 m.

Pianta copertura e sezione IpercoopPlant cover and section Ipercoop

DECATHLON

  • 1 elevation above ground;
  • Section pillars 60×60 cm;
  • Mesh pillars 24,55×12,00 m;
  • Coverage consists tiled Ondal h = 70 cm with concrete shells;
  • Overall height of deck varies from 5.00 maa 5.25 m.

Pianta copertura e sezione Decathlon

Plant cover and section Decathlon

BRICO CENTER

  • 1 elevation above ground;
  • Section pillars 60×60 cm;
  • Mesh pillars 18,75×12,50 m;
  • Coverage consists tiled Ondal h = 70 cm with concrete shells and tiled TT50;
  • Overall height of 7.50 m deck.

Pianta copertura e sezione Brico CenterPlant cover and section Brico Center

POLO TECNOLOGICO

  • 2 elevation above ground;
  • Section pillars 60×60 cm;
  • Mesh pillars first deck 11,25×11,56 m;
  • Mesh pillars coverage 23,10×11,56 m;
  • Intermediate floor consists of tiles TT 50;
  • Coverage consists tiled Ondal h = 70 cm with concrete shells;
  • Overall height first and sec deck 5.50 m;

Pianta copertura e sezione Polo tecnologicoPlant cover and section technology hub

FIRE RESISTANCE

R 120 for all the floors and the roof

INTENDED USE

The “Park Corolla” consists of four commercial buildings including 3 at one elevation and one to two elevations that host respectively Ipercoop and shopping arcade, the Decathlon, the Brico Center and the technological center. All buildings open onto large parking spaces that connect the four business areas.

Cladding walls

They consist of vertical panels in the AC Insulated, 24 cm thick, modulated on step 2.50 m, with finishing grit “pearl of Sicily”. Only for surface finishing dell’Ipercoop were made two-tone panels “pearl of Sicily” and “red Verona” who carry on prospectuses a band that frames the openings.

TIMING OF REALIZATION

Ipercoop and Decathlon

  • Attribution of the contract: May 23, 2006;
  • Start assembling prefabricated structures: February 28, 2007;
  • Final installation of prefabricated structures including ancillary works: October 3, 2007;
  • Open to the public: March 12, 2008.

Brico Center and technological center

  • Attribution of the job: 21-10-2008;
  • Start assembling prefabricated structures: 30-04-2009;
  • Final installation of prefabricated structures including ancillary works: November 30, 2009;
  • Open to the public: spring 2010.

 