Shopping Center Le Vigne

carrefour

SURFACE

Blanket held for sale: 32 620 sq.m.
Covered parking: 27 820 sq.m.

Centro Commerciale Le VigneDivision of the Body of the building

Centro Commerciale Le VigneDivision of the Body of the building

CONSTRUCTION SYSTEM

The Mall “Le Vigne”, is constituted by a multi-storey building with coverage Ondal, composed of several bodies glued (B, C, D, E, F) and a rotated body (A) placed in communication with the other by a structure steel and glass. The bodies are composed of:

Body A

  • two basements;
  • a section pillars of 70×60 cm;
  • a wheelbase pillars 16×16 m;
  • a slab of the first deck made with TT tiles h = 80 cm;
  • a floor covering made of tiles Ondal h = 70 cm beams U h = 90 cm.
  • useful height varying from 4.60 to 6.80 m.

Centro Commerciale Le VigneSection body A

Body B-C-D-E-F:

  • two floors and a basement floor above ground;
  • a section pillars of 70×80 cm;
  • a wheelbase pillars 16×16 m;
  • a slab of the first deck built with tiled vigor h = 70 cm beams to cross;
  • a ceiling on the second deck made with TT tiles h = 80 cm beams to cross;
  • a roof slab made with tiled Ondal h = 70 cm on beams U h = 90 cm and with tiled vigor h = 50 cm (for a small part).
  • useful height varying from 5.00 to 6.80 m.

Centro Commerciale Le VigneSections body C-B

Centro Commerciale Le VigneSections body F-E-C

Centro Commerciale Le Vigne
Sections body D-E

FIRE RESISTANCE

  • R 180 for intermediate floors made with tiled TT 80;
  • R 90 for intermediate floors made with vigor vigor 70th 50;
  • R 90 for the cover made with tiled Ondal 70;

INTENDED USE

The two floors at a lower level of the mall welcome the covered parking which extends for the entire length of the building. At the top level develops the sales floor that houses the hypermarket and shopping gallery that extends to the body A.

CLADDING WALLS

They consist of vertical panels AC, insulated, 20 cm thick, modulated on step 2,50 m fabric smooth bottom formwork.

TIMING OF REALIZATION

  • Supply contract in work of prefabricated: January 4, 2007;
  • Start assembling prefabricated structures: May 2007;
  • Final installation of prefabricated structures including ancillary works: September 2008;
  • Public opening of the mall: November 2008;

 

Share

Data sheet

  • Year: 2008
  • locality: Castrofilippo
  • Province: AG
  • Use: Shopping Center Le Vigne - CARREFOUR