Big constructions

Share

Various

Back

C2 – Shed the Mall Wholesale

SURFACES

  • Coverage to be sold: 222 225 sq.m.
  • Parking uncovered: 84 820 sq.m.

CONSTRUCTION SYSTEM

  • Wholesale center: single-storey consists of more bodies.

Body Type A1-A2-A3: (module 44.00×12.50)

  • a single elevation, with loft;
  • section pillars 60×60 cm;
  • wheelbase pillars 22,00×12,50 m;
  • beams loft inverted T and TL;
  • beams coverage H90 and U90;
  • loft tiled TT50;
  • ONDAL tiled roof slab, concrete shells and skylights shed.

Body Type C1-C2: (module 80.00×12.50)

  • a single elevation, with loft;
  • section pillars 60×60 cm;
  • wheelbase pillars 20,00×12,50 m;
  • beams loft inverted T and TL;
  • beams coverage H90 and U90;
  • loft tiled TT50;
  • ONDAL tiled roof slab, concrete shells and skylights shed.

Body Type B1-B2-B8-B9: (module 72.00×12.50)

  • a single elevation, with loft;
    section pillars 60×60 cm;
    wheelbase pillars 24,00×12,50 m;
    beams loft inverted T and TL;
    beams coverage H90 and U90;
    loft tiled TT50;
    ONDAL tiled roof slab, concrete shells and skylights shed.

C2 - Capannoni del Centro Commerciale all'ingrosso

legend:

  • BE CARRIED
  • REALIZED
  • UNDER CONSTRUCTION

Body type B3-B4-B5-B6-B7: (module 66.00×12.50)

  • a single elevation, with loft;
  • section pillars 60×60 cm;
  • wheelbase pillars 22,00×12,50 m;
  • beams loft inverted T and TL;
  • beams coverage H90 and U90;
  • loft tiled TT50;
  • ONDAL tiled roof slab, concrete shells and skylights shed.

Body Type D1-D2-D3-D4: (module 96.00×12.50)

  • a single elevation, with loft;
  • section pillars 60×60 cm;
  • wheelbase pillars 24,00×12,50 m;
  • beams loft inverted T and TL;
  • beams coverage H90 and U90;
  • loft tiled TT50;
  • ONDAL tiled roof slab, concrete shells and skylights shed.

FIRE RESISTANCE

  • R180 for all the floors covering ONDAL;
  • R60 for all lofts TT50;

INTENDED USE

  • All bodies are for commercial use.

Cladding walls

  • The external walls are formed by vertical panels AC, insulated, 20 cm thick, modulated on step by 2.50 m horizontal panels, insulated, 20 cm thick.
  • The tables are all back and side panels with vertical fabric smooth bottom formwork, painting horizontal stripes, white and orange, to varying degrees;
  • The tables are all front panels with vertical and horizontal fabric smooth bottom formwork, painting horizontal stripes, white and orange, to different degrees and horizontal lines that accentuate the color change of the bands and that are connected with strip windows;
  • The side elevations have no window openings;
  • The financial rear (side entrance goods) have square and diamond-shaped window openings;
  • The financial front (side loft) have different types of window openings: tape, card, a continuous glass, pyramid, square and rectangular;
  • At the joints inside the sheds are dividing panels from solid concrete, 20 cm thick.

TIMING OF REALIZATION

Supply contract in work of prefabricated:

  • Body A1, A2, B5, C2 – November 15, 2004;
  • Body C1 – December 14, 2005;
  • Body B6 – April 7, 2006;
  • Body A3 – June 14, 2006;
  • Body B4 (under construction) – 14 November 2006;
  • Body B3 (under construction) – January 9, 2007;

Start assembling prefabricated structures:

  • March 10, 2005 (body C2);

Public opening of the mall:

  • December 2005.
  • General Company: Construction Italian S.r.l. – Belper (Catania), Michele Scuto S.p.A. – S. Agata Li Battiati (Catania)
  • Director tencnico the yard: geom. Vitale – S. Agata Li Battiati (Catania), geom. Bufalino – Belper (Catania)
  • Architectural Design and Construction: Studio Petrina – Catania
  • Design and manufacturing prefabricated structures: Sicep SpA – Belper (Catania)
  • Project Manager – Sicep S.p.A. .: ing. Salvatore Porto – Catania
  • Site manager – Sicep S.p.A. .: ing. Salvatore Raimondi – Catania
  • Production manager – Sicep S.p.A. .: ing. Angelo Ingrao – Catania
  • Calculation structures in place: Studio Petrina – Catania
  • Calculation prefabricated structures Sicep SpA: ing. Raffaele Partescano – Belper (Catania)

Share

Data sheet

  • Year: 2004
  • locality: Catania
  • Province: CT
  • Use: Sheds the Mall Wholesale
© 2022 SICEP S.p.A. tutti i diritti riservati - P.IVA 03776850871