V.I.D.R. for R.F.I.
![](https://www.sicepspa.it/wp-content/uploads/2023/01/Sicep-certified.png)
![](https://www.sicepspa.it/wp-content/uploads/2023/06/VDR-PER-LA-R.F.I-min.jpg)
Supply and dry laying of reinforced concrete bridge beams related to the WBS IV01-overrail deck as part of the doubling works of the Bicocca – Catenanuova section
Supply and dry laying of reinforced concrete bridge beams related to the WBS IV01-overrail deck as part of the doubling works of the Bicocca – Catenanuova section